Empty Vande Bharat Train Travels 463 Km With Faulty Brakes, Railway Orders Investiga
Category: India News | Railway News
Vande Bharat Train Covers 463 Km Despite Brake Warnings
A serious railway safety concern has emerged after an empty Vande Bharat train travelled approximately 463 kilometres despite having an ineffective braking system. The incident reportedly took place on October 24, when a Vande Bharat chair car rake was being transported from Hatia in Jharkhand towards Jhansi in Uttar Pradesh using a freight locomotive.
According to railway officials, two loco pilots reported problems with the braking performance during the journey. However, the train was allowed to continue without the issue being properly resolved.
The incident has raised questions about railway safety procedures, maintenance checks and the response of railway staff to warnings from train operators.
First Loco Pilot Reports Poor Braking Performance
The problem was initially identified after the train departed from Hatia. During a brake performance test on the Hatia-Ranchi section, the loco pilot noticed that the braking power was extremely poor.
After reaching Ranchi station, the pilot submitted a written complaint to the section controller and traction loco controller, informing them about the braking problem.
Despite receiving this warning, railway staff reportedly allowed the empty train to continue its journey without correcting the issue.
Second Loco Pilot Also Raises Safety Concerns
The situation became more concerning when another loco pilot took charge of the train at Muri station.
The second pilot also noticed problems with the braking system and informed the concerned railway controllers. According to the railway report, the pilot stated that reducing brake pipe pressure was not resulting in the proper application of brakes.
Despite two separate warnings, the train continued travelling towards its destination.
Inspection Reveals Brakes Isolated in All Coaches
The seriousness of the incident became clear when the train reached Deen Dayal Upadhyaya (DDU) station in Uttar Pradesh's Chandauli district.
During an inspection, railway officials reportedly discovered that the braking systems of all the coaches had been isolated. As a result, the coaches' brakes were not functioning as required.
The empty train had covered approximately 463 kilometres using the freight locomotive's brakes and regenerative braking rather than the braking systems of its coaches.
This raised serious concerns because the braking systems of the locomotive and coaches were supposed to work together during the journey.
Preliminary Investigation Finds Multiple Staff Lapses
South Eastern Railway has taken the incident seriously and ordered an investigation into the matter.
An official order dated November 7 directed the Divisional Railway Manager (DRM) of Ranchi to examine the circumstances and identify the employees responsible.
The preliminary findings reportedly pointed towards several failures, including:
- Maintenance staff allegedly failed to physically verify the braking systems before departure.
- Railway controllers reportedly did not take appropriate action after receiving warnings from the loco pilots.
- The train crew was reportedly unfamiliar with certain aspects of the Vande Bharat braking system.
- Required physical checks to confirm that the coach brakes were working were not properly carried out.
The investigation will examine these lapses and recommend corrective measures to prevent similar incidents.
Railway Safety Under Question
Running a train without adequate braking power is a serious safety concern. Even though the Vande Bharat rake was empty during this journey, such a failure could have created risks for railway employees and other train operations.
The incident has once again highlighted the importance of proper maintenance, technical inspections and immediate action whenever train operators report safety-related problems.
South Eastern Railway has directed officials to investigate the matter, establish accountability and suggest preventive measures.
Conclusion
The incident involving an empty Vande Bharat train travelling 463 kilometres with ineffective coach brakes has raised important questions about railway safety and staff responsibility.
The fact that two loco pilots reportedly raised concerns but the train continued its journey highlights the need for stronger safety checks and better coordination among railway departments.
The outcome of the investigation will be important in determining responsibility and ensuring that such lapses do not happen again.
Stay connected with The Times of Eden for the latest India News, Railway Updates and Breaking News.
Comments